/
Energy Consumption and Controls/
ASHRAE 170 Healthcare HVAC Control Energy Performance AssessmentComprehensive Guide to Eurolabs ASHRAE 170 Healthcare HVAC Control Energy Performance Assessment Laboratory Testing Service
ASHRAE 170 is a widely recognized standard for the evaluation of the energy performance of healthcare HVAC systems. This standard, developed by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), provides a framework for assessing the energy efficiency and performance of healthcare facilities HVAC systems.
The ASHRAE 170 standard is based on the principles outlined in ISO 16000-6:2004, which specifies the requirements for evaluating the energy performance of buildings. The standard requires that healthcare facilities undergo regular testing to ensure their HVAC systems are functioning efficiently and effectively.
Eurolabs laboratory testing service for ASHRAE 170 Healthcare HVAC Control Energy Performance Assessment is designed to help healthcare facilities meet these standards and improve their energy efficiency.
Conducting an ASHRAE 170 assessment provides numerous benefits, including:
The consequences of not performing regular ASHRAE 170 assessments include:
Eurolabs ASHRAE 170 laboratory testing service involves a comprehensive evaluation of the healthcare facilitys HVAC system. The test procedure includes:
1. Pre-testing preparation:
Reviewing the facilitys HVAC system design, installation, and operation
Identifying any areas of concern or potential issues
2. Testing equipment and instruments:
High-accuracy temperature and humidity sensors
Airflow meters and anemometers
Pressure sensors and gauges
3. Testing environment requirements:
Temperature range: 15C to 30C (59F to 86F)
Humidity range: 40 to 60
Air pressure: 1013 mbar 10 mbar
4. Sample preparation procedures:
Collecting and preparing air samples for analysis
Ensuring accurate and reliable data collection
5. Testing parameters and conditions:
Temperature and humidity testing
Airflow and pressure testing
System performance evaluation
Eurolabs ASHRAE 170 laboratory testing service provides a comprehensive report detailing the test results, including:
1. Introduction and background information
2. Test methodology and procedures
3. Test equipment and instruments used
4. Testing environment requirements
5. Sample preparation procedures
6. Test parameters and conditions
7. Measurement and analysis methods
8. Calibration and validation procedures
9. Quality control measures during testing
10. Data collection and recording procedures
Conducting an ASHRAE 170 assessment provides numerous benefits, including:
Eurolabs expertise and experience in ASHRAE 170 laboratory testing services include:
1. State-of-the-art equipment and facilities
2. Qualified and certified personnel
3. Accreditation and certification details
4. International recognition and partnerships
5. Quality management systems and procedures
6. Customer service and support capabilities
Conclusion
Eurolabs ASHRAE 170 laboratory testing service is designed to help healthcare facilities meet the standards outlined in ASHRAE 170, ensuring optimal energy efficiency and performance of their HVAC systems. By conducting regular assessments, facility managers and owners can improve patient comfort and safety, reduce energy costs, and enhance compliance with regulatory requirements.
References
ASHRAE (2019). ASHRAE Standard 170-2019: Energy Performance Measurement in Buildings.
ISO (2004). ISO 16000-6:2004. Indoor air - Part 6: Determination of the volatile organic compounds present in indoor and outdoor air.
Eurolab (2023). ASHRAE 170 Laboratory Testing Service.
Appendix
Eurolabs ASHRAE 170 Laboratory Testing Service is designed to meet the following standards:
Eurolabs laboratory testing service includes:
1. Pre-testing preparation
2. Testing equipment and instruments
3. Testing environment requirements
4. Sample preparation procedures
5. Testing parameters and conditions
6. Measurement and analysis methods
7. Calibration and validation procedures
8. Quality control measures during testing
9. Data collection and recording procedures
Eurolabs ASHRAE 170 laboratory testing service provides a comprehensive report detailing the test results, including:
1. Introduction and background information
2. Test methodology and procedures
3. Test equipment and instruments used
4. Testing environment requirements
5. Sample preparation procedures
6. Test parameters and conditions
7. Measurement and analysis methods
8. Calibration and validation procedures
9. Quality control measures during testing
10. Data collection and recording procedures