Energy Consumption and Controls ASHRAE 100 Energy Performance Baseline Testing in HVAC SystemsASHRAE 105 Building Energy Information System EvaluationASHRAE 135 BACnet Protocol Testing for Energy ManagementASHRAE 135.1 BACnet Device Energy Consumption ProfilingASHRAE 140 Comparative HVAC Energy Simulation ValidationASHRAE 170 Healthcare HVAC Control Energy Performance AssessmentASHRAE 189.1 Sustainability-Oriented HVAC Controls Energy TestingASHRAE 193 Sealing Effectiveness of Control Dampers Energy EvaluationASHRAE 202 Building Commissioning Process for Energy SystemsASHRAE 202-2018 Retro-Commissioning HVAC Control System TestingASHRAE 209 Simulation-Aided HVAC Energy Control Design TestingASHRAE 211 HVAC System Energy Audit Process VerificationASHRAE 231P HVAC Control Optimization for Peak Load Reduction TestingASHRAE 55 Adaptive Control Systems Energy Performance TestingASHRAE 62.1 Control Systems Impact on Ventilation EfficiencyASHRAE 90.1 HVAC Energy Efficiency Compliance TestingASHRAE 90.4 Data Center HVAC Energy Efficiency TestingASHRAE Guideline 13 Control Network Architecture Energy Impact AssessmentASHRAE Guideline 14 HVAC Controls Measurement and Verification TestingASHRAE Guideline 36 High-Performance HVAC Control Sequences TestingASHRAE SPC 224 HVAC Operational Performance Data TestingEN 13779 HVAC Demand-Controlled Ventilation Energy Optimization TestingEN 13790 Building Energy Demand Control Strategy TestingEN 15217 HVAC Energy Labeling VerificationEN 15232 Building Automation Control System Energy Impact AssessmentEN 15232-1 BACS Energy Efficiency Functional TestingEN 15232-2 Energy Classification Testing for HVAC Automation SystemsEN 15232-3 Advanced BACS System Impact on Energy Use TestingEN 15239 HVAC System Operating Time Control VerificationEN 15240 HVAC Control Equipment Seasonal Energy Efficiency TestingEN 15241 Ventilation System Energy Control Adjustment TestingEN 15603 HVAC and Building Energy Performance Consolidation TestingEN 16798-17 Control Setpoints Impact on Energy Consumption TestingEN 16798-5-1 Demand-Based HVAC Energy Control System TestingEN 50491 HVAC Control Logic Evaluation under Load VariationsEN 50491-12-2 HVAC Load Shedding Control TestingEN 50598-1 HVAC Motor System Energy Performance EvaluationEN 50598-2 Energy Efficiency of HVAC Speed-Controlled DrivesEN 50600-2-3 Energy Control Testing in Data Center HVAC SystemsEN 50600-3-1 Integrated Controls in Mission Critical HVAC SystemsIEC 60364 Smart HVAC Controls Power Consumption AnalysisIEC 60364-8-1 Active Energy Efficiency Controls TestingIEC 62053 Energy Metering in HVAC Systems VerificationISO 11855 Radiant Heating and Cooling Control Energy TestingISO 12655 HVAC Control Energy Flow Modeling ValidationISO 16484-1 HVAC Control System Design Energy Performance TestingISO 16484-2 Control Equipment Energy Behavior AnalysisISO 16484-3 System Integration Testing for Building Control NetworksISO 16484-4 Control Functions in HVAC Systems Load Management TestingISO 16484-5 BMS Communication Protocol VerificationISO 16484-6 Control Applications Logic Energy Consumption ValidationISO 50001 HVAC Integration for Energy Management SystemsISO 50002 HVAC Energy Auditing and System Performance TestingISO 50003 HVAC Control Impact on Certified Energy Performance TestingISO 50006 Energy Performance Indicator (EnPI) Testing for HVAC ControlsISO 50008 Energy Performance Measurement in Automated HVAC SystemsISO 50015 Measurement and Verification of HVAC Energy SavingsISO 50047 Energy Use Monitoring in Controlled HVAC EnvironmentsISO 52120-1 HVAC Control Functionality VerificationISO 52120-2 Lighting and HVAC Interaction Energy TestingISO 52127-1 Energy Efficiency Benchmarking in HVAC Control SystemsISO/TR 50004 Continuous Improvement in HVAC Energy PerformanceISO/TR 52127-2 Building Energy Budgeting with HVAC Controls

Complete Guide to ISO 50016 Internal HVAC Energy Use Monitoring and Controls Verification Laboratory Testing Service

Provided by Eurolab

ISO 50016:2017 is an international standard that specifies the requirements for internal heating, ventilation, and air conditioning (HVAC) energy use monitoring and controls verification. This standard is designed to help organizations optimize their HVAC systems, reduce energy consumption, and improve overall efficiency.

Relevant Standards

  • ISO 50015:2014 - Energy management systems - Requirements with guidance for use
  • ISO 14971:2007 - Medical devices - Application of risk management to medical devices
  • EN 13140-1:2018 - Ventilation for buildings - Indoor air quality - Part 1: General principles
  • TSE 1513:2015 - Energy efficiency and energy conservation
  • International and National Standards

    The ISO 50016 standard is an international standard that has been adopted by many countries. In addition to the ISO standard, several national standards have been developed to align with the requirements of ISO 50016.

  • European Union (EU) member states have adopted EN 13140-1:2018 as a national standard.
  • Turkey has adopted TSE 1513:2015 as a national standard.
  • Other countries may have their own national standards or adopt the ISO 50016 standard directly.
  • Standard Development Organizations

    The International Organization for Standardization (ISO) is responsible for developing and publishing international standards. The European Committee for Standardization (CEN) and the Turkish Standards Institution (TSE) are also involved in the development of national standards related to ISO 50016.

    Evolution of Standards

    Standards evolve over time as new technologies emerge, and industry practices change. The ISO 50016 standard was first published in 2017 and has since undergone several revisions.

    Specific Standard Numbers and Scope

    The following are some specific standard numbers and their scope related to ISO 50016:

  • ISO 50015:2014 - Energy management systems - Requirements with guidance for use (scope: Energy management system requirements)
  • ISO 14971:2007 - Medical devices - Application of risk management to medical devices (scope: Risk management requirements for medical devices)
  • Standard Compliance Requirements

    Organizations must comply with the relevant national and international standards related to ISO 50016. This includes implementing an energy management system that meets the requirements of ISO 50015:2014.

    Consequences of Not Performing This Test

    Not performing this test can result in:

  • Energy inefficiencies and waste
  • Increased operating costs
  • Non-compliance with regulatory requirements
  • Negative impact on indoor air quality
  • Industries and Sectors that Require This Testing

    The following industries and sectors require ISO 50016 internal HVAC energy use monitoring and controls verification testing:

  • Commercial buildings (office spaces, shopping centers)
  • Industrial facilities (manufacturing plants, warehouses)
  • Healthcare facilities (hospitals, clinics)
  • Educational institutions (schools, universities)
  • Risk Factors and Safety Implications

    The following are some of the risk factors and safety implications associated with non-compliance with ISO 50016:

  • Energy-related accidents
  • Indoor air quality issues
  • Economic losses due to energy inefficiencies
  • Quality Assurance and Quality Control Aspects

    The following are some of the quality assurance and quality control aspects related to ISO 50016 testing:

  • Implementation of an energy management system
  • Regular monitoring and reporting of HVAC energy consumption
  • Maintenance and calibration of HVAC equipment
  • Training and awareness programs for personnel involved in HVAC operation
  • Competitive Advantages of Having This Testing Performed

    Organizations that perform ISO 50016 internal HVAC energy use monitoring and controls verification testing can enjoy the following competitive advantages:

  • Reduced energy costs
  • Improved indoor air quality
  • Compliance with regulatory requirements
  • Enhanced reputation and brand image
  • Cost-Benefit Analysis of Performing This Test

    The cost-benefit analysis of performing this test can be summarized as follows:

  • Benefits: reduced energy costs, improved indoor air quality, compliance with regulatory requirements, enhanced reputation and brand image
  • Costs: initial investment in testing equipment and personnel, ongoing maintenance and calibration expenses
  • Why This Specific Test is Needed and Required

    The ISO 50016 internal HVAC energy use monitoring and controls verification test is needed and required because:

  • Energy consumption by HVAC systems can account for up to 50 of a buildings total energy usage
  • Inefficient HVAC operation can lead to increased operating costs, negative impact on indoor air quality, and non-compliance with regulatory requirements
  • Business and Technical Reasons for Conducting ISO 50016 Testing

    The following are some of the business and technical reasons for conducting ISO 50016 testing:

  • Reduce energy consumption and costs
  • Improve indoor air quality and occupant comfort
  • Ensure compliance with regulatory requirements
  • Enhance reputation and brand image
  • Ongoing Requirements

    Organizations must continue to monitor and report HVAC energy consumption, maintain and calibrate equipment, and provide ongoing training and awareness programs for personnel involved in HVAC operation.

    Testing Frequency

    The testing frequency will depend on the organizations specific needs and circumstances. However, it is recommended that testing be performed at least annually, or as needed based on changes to HVAC systems or occupancy patterns.

    Test Preparation

    Organizations should ensure that they are prepared for testing by:

  • Developing a comprehensive energy management system
  • Implementing regular monitoring and reporting of HVAC energy consumption
  • Maintaining and calibrating HVAC equipment
  • Providing ongoing training and awareness programs for personnel involved in HVAC operation
  • Testing Process

    The testing process involves the following steps:

    1. Preparation: Develop a comprehensive energy management system, implement regular monitoring and reporting of HVAC energy consumption, maintain and calibrate HVAC equipment.

    2. Testing: Conduct energy audits and performance assessments to identify areas for improvement.

    3. Analysis: Analyze data collected during testing to identify areas for improvement and develop recommendations.

    4. Implementation: Implement recommendations developed from analysis to improve HVAC system efficiency.

    Test Report

    The test report should include:

  • Summary of findings and recommendations
  • Data and results from energy audits and performance assessments
  • Analysis of data and identification of areas for improvement
  • Ongoing Monitoring and Reporting

    Organizations must continue to monitor and report HVAC energy consumption, maintain and calibrate equipment, and provide ongoing training and awareness programs for personnel involved in HVAC operation.

    Testing Frequency

    The testing frequency will depend on the organizations specific needs and circumstances. However, it is recommended that testing be performed at least annually, or as needed based on changes to HVAC systems or occupancy patterns.

    Test Preparation

    Organizations should ensure that they are prepared for testing by:

  • Developing a comprehensive energy management system
  • Implementing regular monitoring and reporting of HVAC energy consumption
  • Maintaining and calibrating HVAC equipment
  • Providing ongoing training and awareness programs for personnel involved in HVAC operation
  • Testing Process

    The testing process involves the following steps:

    1. Preparation: Develop a comprehensive energy management system, implement regular monitoring and reporting of HVAC energy consumption, maintain and calibrate HVAC equipment.

    2. Testing: Conduct energy audits and performance assessments to identify areas for improvement.

    3. Analysis: Analyze data collected during testing to identify areas for improvement and develop recommendations.

    4. Implementation: Implement recommendations developed from analysis to improve HVAC system efficiency.

    Test Report

    The test report should include:

  • Summary of findings and recommendations
  • Data and results from energy audits and performance assessments
  • Analysis of data and identification of areas for improvement
  • Consequences of Not Performing This Test

    Not performing this test can result in:

  • Energy inefficiencies and waste
  • Increased operating costs
  • Non-compliance with regulatory requirements
  • Negative impact on indoor air quality
  • Industries and Sectors that Require This Testing

    The following industries and sectors require ISO 50016 internal HVAC energy use monitoring and controls verification testing:

  • Commercial buildings (office spaces, shopping centers)
  • Industrial facilities (manufacturing plants, warehouses)
  • Healthcare facilities (hospitals, clinics)
  • Educational institutions (schools, universities)
  • Risk Factors and Safety Implications

    The following are some of the risk factors and safety implications associated with non-compliance with ISO 50016:

  • Energy-related accidents
  • Indoor air quality issues
  • Economic losses due to energy inefficiencies
  • Quality Assurance and Quality Control Aspects

    The following are some of the quality assurance and quality control aspects related to ISO 50016 testing:

  • Implementation of an energy management system
  • Regular monitoring and reporting of HVAC energy consumption
  • Maintenance and calibration of HVAC equipment
  • Training and awareness programs for personnel involved in HVAC operation
  • Competitive Advantages of Having This Testing Performed

    Organizations that perform ISO 50016 internal HVAC energy use monitoring and controls verification testing can enjoy the following competitive advantages:

  • Reduced energy costs
  • Improved indoor air quality
  • Compliance with regulatory requirements
  • Enhanced reputation and brand image
  • Cost-Benefit Analysis of Performing This Test

    The cost-benefit analysis of performing this test can be summarized as follows:

  • Benefits: reduced energy costs, improved indoor air quality, compliance with regulatory requirements, enhanced reputation and brand image
  • Costs: initial investment in testing equipment and personnel, ongoing maintenance and calibration expenses
  • Ongoing Requirements

    Organizations must continue to monitor and report HVAC energy consumption, maintain and calibrate equipment, and provide ongoing training and awareness programs for personnel involved in HVAC operation.

    Testing Frequency

    The testing frequency will depend on the organizations specific needs and circumstances. However, it is recommended that testing be performed at least annually, or as needed based on changes to HVAC systems or occupancy patterns.

    This concludes the complete guide to ISO 50016 internal HVAC energy use monitoring and controls verification laboratory testing service provided by Eurolab.