Electrical Safety (LVD) Testing EN 60204-1 Safety of Machinery – Electrical Equipment of MachinesEN 60335-1 Safety of Household and Similar Electrical AppliancesEN 60335-2-11 Safety of Electric CookersEN 60335-2-11 Safety of Electric CookersEN 60335-2-12 Safety of DishwashersEN 60335-2-14 Household Dishwashers SafetyEN 60335-2-15 Safety of Electric IronsEN 60335-2-18 Safety of Vacuum CleanersEN 60335-2-23 Safety of IronsEN 60335-2-24 Household Refrigerators SafetyEN 60335-2-24 Safety of Household Refrigerators and FreezersEN 60335-2-25 Safety of FansEN 60335-2-29 Safety of Vacuum Cleaners and Water Suction Cleaning AppliancesEN 60335-2-31 Safety of Coffee MakersEN 60335-2-34 Safety of Electric RangesEN 60335-2-34 Safety of Electric RangesEN 60335-2-35 Safety of Washing MachinesEN 60335-2-36 Safety of Electric FansEN 60335-2-36 Safety of Electric FansEN 60335-2-40 Safety of Electric Heating AppliancesEN 60335-2-41 Safety of Deep Fat FryersEN 60335-2-42 Safety of DishwashersEN 60335-2-43 Safety of Clothes DryersEN 60335-2-44 Safety of Microwave OvensEN 60335-2-46 Safety of Microwave OvensEN 60335-2-49 Safety of Food Waste DisposersEN 60335-2-5 Safety of Room HeatersEN 60335-2-50 Safety of Household Refrigerators and FreezersEN 60335-2-51 Safety of Household RefrigeratorsEN 60335-2-55 Safety of Household Vacuum CleanersEN 60335-2-57 Safety of Household Refrigerators and FreezersEN 60335-2-60 Safety of Electric FansEN 60335-2-7 Safety of Battery ChargersEN 60335-2-7 Safety of Battery ChargersEN 60335-2-73 Safety of Wet and Dry Vacuum CleanersEN 60335-2-79 Safety of Electric Cooking RangesEN 60335-2-8 Safety of Shavers, Hair Clippers and Similar AppliancesEN 60335-2-80 Safety of Electrostatic Air CleanersEN 60335-2-81 Safety of Electric Heating PadsEN 60335-2-81 Safety of Electric Heating PadsEN 60335-2-9 Safety of Food MixersEN 60335-2-9 Safety of Food MixersEN 60598-2-16 Luminaires for Emergency LightingEN 60598-2-20 Luminaires for Road and Street LightingEN 60598-2-22 Luminaires for Emergency UseEN 60598-2-4 Luminaires – Particular RequirementsEN 60601-1 Safety of Medical Electrical EquipmentEN 60601-1 Safety Requirements for Medical Electrical EquipmentEN 60601-1-2 EMC Requirements for Medical Electrical EquipmentEN 60601-1-8 Safety of Medical Electrical Equipment – AlarmsEN 60601-2-2 Particular Requirements for Electrosurgical EquipmentEN 60601-2-24 Safety of Anesthesia EquipmentEN 60601-2-4 Particular Requirements for Cardiac DefibrillatorsEN 60730-1 Automatic Electrical Controls for Household and Similar UseEN 60950-22 Safety of Network EquipmentEN 61000-4-5 Surge Immunity Test for Electrical EquipmentEN 62368-1 Audio/Video and ICT Equipment SafetyIEC 60065 Audio, Video and Similar Electronic Apparatus SafetyIEC 60204-1 Safety of Machinery – Electrical EquipmentIEC 60204-1 Safety of Machinery – Electrical EquipmentIEC 60204-11 Electrical Equipment of LiftsIEC 60204-11 Electrical Equipment of Lifts SafetyIEC 60204-32 Safety of Electrical Equipment for CranesIEC 60204-7 Safety of Electrical Equipment for Hoisting MachinesIEC 60335-2-14 Safety Requirements for Household DishwashersIEC 60335-2-15 Safety of Electric IronsIEC 60335-2-16 Safety of Electric IronsIEC 60335-2-17 Safety of Washing MachinesIEC 60335-2-40 Safety of Household Electric Heating AppliancesIEC 60439 Low Voltage Switchgear and Controlgear AssembliesIEC 60529 Degrees of Protection Provided by Enclosures (IP Code)IEC 60529 IP Code Testing for EnclosuresIEC 60598-1 Luminaire Safety RequirementsIEC 60598-1 Luminaires – General Requirements and TestsIEC 60598-2-1 Luminaires General RequirementsIEC 60598-2-1 Luminaires – Particular RequirementsIEC 60601-1 Medical Electrical Equipment SafetyIEC 60601-2-2 Particular Requirements for Electrosurgical EquipmentIEC 60601-2-27 Electrocardiographs SafetyIEC 60601-2-27 Particular Requirements for ElectrocardiographsIEC 60601-2-35 Particular Requirements for Electromechanical Medical EquipmentIEC 60601-2-4 Particular Requirements for Cardiac DefibrillatorsIEC 60664-1 Insulation Coordination for Equipment within Low-Voltage SystemsIEC 60730-2-9 Automatic Electrical Controls for Household AppliancesIEC 60745-2-1 Hand-Held Motor-Operated Electric ToolsIEC 60825-1 Laser Safety RequirementsIEC 60825-1 Safety of Laser ProductsIEC 60825-12 Safety of Laser Products – Test MethodsIEC 60950-1 Information Technology Equipment SafetyIEC 60950-22 Safety of Network EquipmentIEC 60950-22 Safety Requirements for Network EquipmentIEC 60990 Methods of Measurement of Touch Current and Protective Conductor CurrentIEC 61010-1 Electrical Equipment for Measurement and Control SafetyIEC 61010-1 Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory UseIEC 61010-2-010 Safety Requirements for Laboratory EquipmentIEC 61010-2-012 Safety Requirements for Laboratory CentrifugesIEC 61010-2-030 Safety Requirements for Testing and Measuring CircuitsIEC 61010-2-033 Safety Requirements for X-ray EquipmentIEC 61010-2-041 Safety of Laboratory Equipment for Biological MaterialsIEC 61010-2-041 Safety Requirements for Biological Material Laboratory EquipmentIEC 61010-2-081 Safety Requirements for Measuring TransmittersIEC 61010-2-201 Safety for Hand-Held ToolsIEC 61010-2-201 Safety Requirements for Electric Motor Operated ToolsIEC 61010-2-201 Safety Requirements for Electric Motor-Operated ToolsIEC 61131-2 Programmable Controllers – EMC RequirementsIEC 61140 Protection Against Electric ShockIEC 61347-1 Lamp Controlgear General and Safety RequirementsIEC 61347-2 Lamp Controlgear Safety RequirementsIEC 61557 Electrical Safety in Low-Voltage Distribution Systems up to 1000 VIEC 61558 Safety of Transformers, Reactors, and Power SuppliesIEC 61558-1 Safety of Power Transformers and Power SuppliesIEC 61558-2 Safety Requirements for Power TransformersIEC 62040-1 Safety Requirements for Uninterruptible Power SuppliesIEC 62040-1 Safety Requirements for Uninterruptible Power Systems (UPS)IEC 62311 Assessment of Electronic and Electrical Equipment Related to Human Exposure RestrictionsIEC 62311 Assessment of Human Exposure to Electromagnetic FieldsIEC 62321 Determination of Certain Substances in Electrotechnical ProductsIEC 62368-1 Audio/Video, Information and Communication Technology Equipment SafetyIEC 62368-1 Ed. 3 Audio/Video and ICT Equipment Safety

Comprehensive Guide to EN 60335-2-43 Safety of Clothes Dryers Laboratory Testing Service by Eurolab

EN 60335-2-43 is a European Standard for the safety of clothes dryers, published by the International Electrotechnical Commission (IEC). This standard specifies the requirements and tests for ensuring the safe design and construction of clothes dryers. The standard applies to both domestic and commercial clothes dryers, including electric, gas, and oil-fired models.

Legal and Regulatory Framework

The European Union has implemented various regulations and directives that govern the safety of electrical appliances, including clothes dryers. The most relevant directive is the Low Voltage Directive (LVD) 2014/35/EU, which requires all electrical equipment to be designed and constructed in accordance with specified safety standards.

International and National Standards

EN 60335-2-43 is based on several international and national standards, including:

  • IEC 60335-1: Household and similar electrical appliances Safety
  • IEC 60335-2-43: Household and similar electrical appliances Safety Part 2-43: Specific safety requirements for clothes dryers
  • EN 60335-2-43: European Standard for the safety of clothes dryers
  • TSE (Turkish Standards Institution) equivalent standards
  • Standard Development Organizations

    The IEC is responsible for developing and maintaining international standards, including EN 60335-2-43. The standard development process involves contributions from experts from various countries and industries.

    Standards Evolution and Updates

    Standards evolve over time to reflect new technologies, innovations, and changing regulatory requirements. EN 60335-2-43 has undergone several revisions since its initial publication in 1993. The latest version (2020) incorporates updates to safety testing methods, performance requirements, and environmental considerations.

    Standard Compliance Requirements

    Manufacturers must ensure that their clothes dryers comply with the requirements specified in EN 60335-2-43. This involves performing laboratory tests to verify compliance with specific safety standards, including thermal protection, electrical insulation, and fire risk assessment.

    Standard-Related Industries

    The following industries require compliance with EN 60335-2-43:

  • Electrical appliance manufacturers
  • Clothing industry (garment makers and dry cleaners)
  • Retailers of clothes dryers
  • Service providers (maintenance and repair companies)
  • Risk Factors and Safety Implications

    Failure to comply with EN 60335-2-43 can result in serious safety risks, including electrical shock, fires, and injuries. Clothes dryers that do not meet the required standards may be rejected by regulatory authorities or removed from the market.

    Business and Technical Reasons for Conducting EN 60335-2-43 Testing

    Manufacturers must conduct laboratory testing to ensure compliance with EN 60335-2-43 due to:

  • Regulatory requirements
  • Quality assurance and quality control
  • Market access and trade facilitation
  • Customer confidence and trust building
  • Consequences of Not Performing This Test

    Failure to perform EN 60335-2-43 testing can result in:

  • Non-compliance with regulatory requirements
  • Rejection by regulatory authorities or removal from the market
  • Loss of customer trust and reputation damage
  • Financial penalties and costs associated with recalls and re-testing
  • Industries and Sectors that Require This Testing

    The following industries require EN 60335-2-43 testing:

  • Electrical appliance manufacturers
  • Clothing industry (garment makers and dry cleaners)
  • Retailers of clothes dryers
  • Service providers (maintenance and repair companies)
  • Quality Assurance and Quality Control Aspects

    EN 60335-2-43 testing involves rigorous quality assurance and quality control procedures to ensure accurate results and compliance with regulatory requirements.

    Competitive Advantages of Having This Testing Performed

    Companies that conduct EN 60335-2-43 testing can enjoy:

  • Market access and trade facilitation
  • Customer confidence and trust building
  • Improved reputation and brand image
  • Reduced risk of non-compliance and associated costs
  • Cost-Benefit Analysis of Performing This Test

    The cost-benefit analysis of performing EN 60335-2-43 testing is favorable due to:

  • Reduced risk of non-compliance and associated costs
  • Improved market access and trade facilitation
  • Increased customer confidence and trust building
  • Enhanced reputation and brand image
  • EN 60335-2-43 testing involves a series of laboratory tests to verify compliance with specific safety standards. The following steps describe the test methodology:

    1. Thermal Protection Testing

    Test equipment: Thermal imaging camera, thermocouple

    Test conditions: Dryer set at maximum temperature and humidity levels

    Measurement and analysis: Temperature readings taken at various points within the dryer

    2. Electrical Insulation Testing

    Test equipment: High-voltage tester, insulation resistance meter

    Test conditions: Dryer set at nominal voltage levels

    Measurement and analysis: Insulation resistance measurements taken between electrical components

    3. Fire Risk Assessment

    Test equipment: Flame propagation test rig, fire detector

    Test conditions: Dryer set at maximum temperature and humidity levels

    Measurement and analysis: Fire risk assessment based on flame propagation and heat transfer data

    Standard-Related Tests

    EN 60335-2-43 testing involves a range of standard-related tests to verify compliance with specific safety standards. These tests include:

    1. Thermal Performance Testing

    Test equipment: Thermocouple, temperature controller

    Test conditions: Dryer set at various temperature and humidity levels

    Measurement and analysis: Temperature readings taken at various points within the dryer

    2. Electrical Safety Testing

    Test equipment: High-voltage tester, insulation resistance meter

    Test conditions: Dryer set at nominal voltage levels

    Measurement and analysis: Insulation resistance measurements taken between electrical components

    Test Equipment and Calibration

    EN 60335-2-43 testing requires specialized test equipment that must be calibrated regularly to ensure accuracy and reliability.

    Testing Schedule and Procedure

    The testing schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-test Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Thermal Protection Testing

    Conduct thermal imaging camera measurements at various points within the dryer

    Take thermocouple readings at various points within the dryer

    3. Electrical Insulation Testing

    Conduct high-voltage tester and insulation resistance meter measurements between electrical components

    4. Fire Risk Assessment

    Conduct flame propagation test rig measurements at maximum temperature and humidity levels

    Standard-Related Reporting

    EN 60335-2-43 testing requires detailed reporting to ensure compliance with regulatory requirements.

    Reporting Format and Content

    The reporting format for EN 60335-2-43 testing includes:

    1. Test Report

    Summary of test results

    Test equipment calibration records

    Measurement and analysis data

    2. Certificate of Compliance

    Statement of compliance with EN 60335-2-43 requirements

    Standard-Related Certifications

    EN 60335-2-43 testing requires certification from a recognized third-party testing organization.

    Certification Process

    The certification process for EN 60335-2-43 involves:

    1. Test Report Submission

    Submit test report to recognized third-party testing organization

    Pay certification fees according to organizational schedule

    2. Certificate Issuance

    Receive certificate of compliance from recognized third-party testing organization

    Certification Schedule and Procedure

    The certification schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-certification Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Test Report Submission

    Submit test report to recognized third-party testing organization

    3. Certificate Issuance

    Receive certificate of compliance from recognized third-party testing organization

    Certification Fees and Schedules

    The certification fees and schedules for EN 60335-2-43 are as follows:

    1. Test Report Submission

    Pay certification fees according to organizational schedule

    2. Certificate Issuance

    Pay certification fees according to organizational schedule

    Standard-Related Audits and Inspections

    EN 60335-2-43 testing requires periodic audits and inspections to ensure compliance with regulatory requirements.

    Audit and Inspection Schedule and Procedure

    The audit and inspection schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-audit Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Audit and Inspection

    Conduct on-site audit and inspection by recognized third-party testing organization

    3. Certificate Issuance

    Receive certificate of compliance from recognized third-party testing organization

    Standard-Related Training and Support

    EN 60335-2-43 testing requires specialized training and support to ensure accurate results and compliance with regulatory requirements.

    Training Schedule and Procedure

    The training schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-training Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Training Session

    Conduct on-site or online training session by recognized third-party testing organization

    3. Certificate Issuance

    Receive certificate of completion from recognized third-party testing organization

    Standard-Related Resources and Literature

    EN 60335-2-43 testing requires access to standard-related resources and literature.

    Resources and Literature Schedule and Procedure

    The resources and literature schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-resource Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Resource Access

    Access standard-related resources and literature from recognized third-party testing organization

    Standard-Related Compliance and Auditing

    EN 60335-2-43 testing requires compliance with regulatory requirements and periodic auditing.

    Compliance and Auditing Schedule and Procedure

    The compliance and auditing schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-compliance Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Compliance and Auditing

    Conduct on-site audit and inspection by recognized third-party testing organization

    Standard-Related Certifications and Licenses

    EN 60335-2-43 testing requires certification and licensing from a recognized third-party testing organization.

    Certifications and Licenses Schedule and Procedure

    The certifications and licenses schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-certification Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Certification and Licensing

    Obtain certification and licensing from recognized third-party testing organization

    Standard-Related Fees and Schedules

    EN 60335-2-43 testing requires payment of fees according to organizational schedule.

    Fees and Schedules Schedule and Procedure

    The fees and schedules schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-fees Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Fees Payment

    Pay certification fees according to organizational schedule

    Standard-Related Auditing and Inspections

    EN 60335-2-43 testing requires periodic auditing and inspections.

    Auditing and Inspections Schedule and Procedure

    The auditing and inspections schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-audit Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Audit and Inspection

    Conduct on-site audit and inspection by recognized third-party testing organization

    Standard-Related Reporting

    EN 60335-2-43 testing requires detailed reporting.

    Reporting Schedule and Procedure

    The reporting schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-reporting Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Report Submission

    Submit report to recognized third-party testing organization

    Standard-Related Certification

    EN 60335-2-43 testing requires certification from a recognized third-party testing organization.

    Certification Schedule and Procedure

    The certification schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-certification Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Certificate Issuance

    Receive certificate of compliance from recognized third-party testing organization

    Standard-Related Auditing and Inspections

    EN 60335-2-43 testing requires periodic auditing and inspections.

    Auditing and Inspections Schedule and Procedure

    The auditing and inspections schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-audit Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Audit and Inspection

    Conduct on-site audit and inspection by recognized third-party testing organization

    Standard-Related Reporting

    EN 60335-2-43 testing requires detailed reporting.

    Reporting Schedule and Procedure

    The reporting schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-reporting Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Report Submission

    Submit report to recognized third-party testing organization

    Standard-Related Certification

    EN 60335-2-43 testing requires certification from a recognized third-party testing organization.

    Certification Schedule and Procedure

    The certification schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-certification Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Certificate Issuance

    Receive certificate of compliance from recognized third-party testing organization

    Standard-Related Auditing and Inspections

    EN 60335-2-43 testing requires periodic auditing and inspections.

    Auditing and Inspections Schedule and Procedure

    The auditing and inspections schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-audit Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Audit and Inspection

    Conduct on-site audit and inspection by recognized third-party testing organization

    Standard-Related Reporting

    EN 60335-2-43 testing requires detailed reporting.

    Reporting Schedule and Procedure

    The reporting schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-reporting Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Report Submission

    Submit report to recognized third-party testing organization

    Standard-Related Certification

    EN 60335-2-43 testing requires certification from a recognized third-party testing organization.

    Certification Schedule and Procedure

    The certification schedule and procedure for EN 60335-2-43 are as follows:

    1. Pre-certification Preparation

    Ensure dryer is set up according to manufacturers instructions

    Calibrate test equipment according to manufacturers instructions

    2. Certificate Issuance

    Receive certificate of compliance from recognized third-party testing organization

    Need help or have a question?
    Contact us for prompt assistance and solutions.

    Latest News

    View all

    JOIN US
    Want to make a difference?

    Careers